【24h】

Iscor's experience with On - Line PD Testing on 3.3kV Motors

机译:Iscor在3.3kV电机上进行在线PD测试的经验

获取原文
获取原文并翻译 | 示例

摘要

It is widely recognised that partial discharge is present and measurable in machines with an operating voltage exceeding 6.6 kV. However, at lower voltages, especially on 3.3 kV machines the effect of PD, if any is unknown. Using existing PD monitoring equipment (such as epoxy-mica capacitors and the TGA test instrument) an attempt was made to monitor the effect of PD on 3.3 kV insulation systems. This was done in order to determine PD levels, as well as failure mechanisms and eventually obtain sufficient data to establish acceptance standards for machines operating at these voltages.
机译:众所周知,工作电压超过6.6 kV的机器中存在局部放电,并且可以测量。但是,在较低电压下,尤其是在3.3 kV机器上,PD的影响(如果有的话)是未知的。使用现有的局放监测设备(例如环氧云母电容器和TGA测试仪器)试图监测局放对3.3 kV绝缘系统的影响。这样做是为了确定PD水平以及故障机制,并最终获得足够的数据来建立在这些电压下运行的机器的验收标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号