Rewind Experience of Hydrogenerators within the Army Corps of Engineers, Portland District

机译:波特兰区陆军工程兵团中水轮发电机的倒带经验

获取原文
获取原文并翻译 | 示例

摘要

Portland District has 3 large powerhouses (5043.2 MW) and 9 small powerhouses (457 MW). As our plants are aging, more and more of the generating units are showing problems which can no longer be fixed with repairs; the most economical action is to completely replace the stator winding. This is often combined with other remedial work, such as replacing the bearings and repairing pits and erosion of the turbines. Over the past decade, we have performed rewinds as follows: (number of generators rewound, by year) In the past, rewinds were done on an as-needed basis, after a catastrophic failure. At the present time, more and more of our rewinds are being done on units that are still functional, but whose reliability is very much in question and whose projected remaining life is deemed to be very short.
机译:波特兰区拥有3个大型发电站(5043.2 MW)和9个小型发电站(457 MW)。随着我们工厂的老化,越来越多的发电机组显示出无法修复的问题;最经济的措施是完全更换定子绕组。这通常与其他补救工作结合在一起,例如更换轴承,修理凹坑和涡轮机腐蚀。在过去的十年中,我们执行了以下倒带操作:(按年份倒带的发电机数量)过去,在发生灾难性故障后,倒带操作是根据需要进行的。目前,越来越多的倒带工作是在仍可正常使用的设备上完成的,但其可靠性受到很大质疑,并且预计剩余寿命很短。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号