Evaluation of geodetic measurement systems

机译:大地测量系统评估

获取原文
获取原文并翻译 | 示例

摘要

Abstract: We analyze in this paper the relationship between geodetic measurement instrumentation, measurement processes, and man-hours required. To initialize this research, we carried out a detailed study of the current practice using standard tools and techniques from `industrial engineering.' We ran an experiment with geodesy students to carry out a time and motion study of the one-man-system of geodimeter and compared it with a traditional `two-man-setup.' The time analysis was done by videotaping the user during the operation and simultaneously recording the time of keystrokes in the recording unit of the instrument. We found that the students lost 15% to 50% for setting up the instrument and storing various initial information. These times are the same for the conventional two- man setup. We also determined average times of different parts of setup and measurement operations. !9
机译:摘要:我们分析了大地测量仪器,测量过程和所需工时之间的关系。为了初始化这项研究,我们使用“工业工程”的标准工具和技术对当前实践进行了详细研究。我们与大地测量学学生进行了一项实验,对测地线的单人系统进行了时间和运动研究,并将其与传统的“两人系统”进行了比较。通过在操作过程中对用户进行录像,并同时将击键的时间记录在仪器的记录单元中来进行时间分析。我们发现,学生由于安装仪器和存储各种初始信息而损失了15%至50%。对于传统的两人式设置,这些时间相同。我们还确定了设置和测量操作不同部分的平均时间。 !9

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号