Contract reform and improvement initiatives were mandated by Congress after the Inspector General's (IG) assertion that the DOE was guilty of waste, fraud, and abuse. As part of this contract reform process, the Department of Energy (DOE) undergoes contract transitions each year. This study examines these transitions in more detail to determine which factors are critical to successful contract change. In general, employees and contract management personnel have viewed contract transitions as costly, time consuming, and disruptive. It is widely felt that, in its contract transition process, the DOE creates morale and motivation problems within the research and production community of its national laboratories and production sites. In the present study, actual data has been analyzed to determine if a set of result variables related to people, processes, and performance are changed due to contract transitions. This study also evaluates the Department of Energy's contract reform process as a whole to determine its impact on a set of result variables that are important to the DOE's specific goals and objectives. To this end, the following research questions are addressed: 1) What result variables were affected during the contract transition event in which contractors changed within a Department of Energy laboratory or production site? 2) What was the impact on the result variables after the contract transition occurred? 3) What was the impact on the result variables for the DOE Offices of Environmental Management, National Nuclear Security Administration, and the Office of Science due to the contract transition? 4) What was the impact on the result variables for national laboratories versus production sites due to the contract transition? 5) What was the impact on the result variables for contract transitions that were considered to be successful versus those that were considered to be unsuccessful?;The result variables chosen for this study relate to people, processes, and performance, as they represent what the DOE considers to be important in measuring success. These variables have been compared both before and after the implementation of contract change to measure their organizational impact.;The study considered all forty of the Department of Energy's national laboratories and production sites. The result variables were examined for labs and production sites that experienced at least one contract transition over the last 15 years.;When looking at the entire collection of data for all DOE offices, including the National Nuclear Security Administration (NNSA), the Office of Science (OS), and the Environmental Management (EM) Office, the total recordable case rate (a measure of safety performance), the nonconformance tracking system (a measure of compliance to regulatory requirements), and the comprehensive budget were statistically significant, with a significance level of 5%. The R&D 100 awards (a measure of research and development) and the notices of violations (a measure of compliance to regulatory requirements) were statistically significant with a significance level of 10%. The other result variables (patents, award fee, attrition, and occurrence reports) were not statistically changed after contract transition in any Department of Energy office.
机译:监察长(DO)认定DOE犯有浪费,欺诈和滥用罪后,国会要求进行合同改革和改进计划。作为此合同改革过程的一部分,能源部(DOE)每年都要进行合同过渡。这项研究更详细地研究了这些过渡,以确定哪些因素对成功变更合同至关重要。通常,员工和合同管理人员将合同转换视为昂贵,费时且具有破坏性的。人们普遍认为,在合同过渡过程中,能源部在其国家实验室和生产基地的研究和生产社区中产生了士气和动力问题。在本研究中,已对实际数据进行了分析,以确定与人员,流程和绩效相关的一组结果变量是否由于合同过渡而发生了变化。这项研究还评估了能源部的整个合同改革过程,以确定其对一系列结果变量的影响,这些结果变量对能源部的特定目的和目标很重要。为此,解决了以下研究问题:1)在合同过渡期间,承包商在能源部实验室或生产场地内更换合同时,哪些结果变量受到影响? 2)合同过渡后对结果变量有什么影响? 3)由于合同过渡,对美国能源部环境管理办公室,国家核安全局和科学办公室的结果变量有何影响? 4)合同过渡对国家实验室和生产场所的结果变量有什么影响? 5)被认为是成功的合同转换与被认为没有成功的合同转换对结果变量有什么影响?;本研究选择的结果变量涉及人员,过程和绩效,因为它们代表了什么? DOE认为对衡量成功至关重要。在执行合同变更之前和之后都对这些变量进行了比较,以衡量它们对组织的影响。该研究考虑了能源部国家实验室和生产基地的所有40个场所。检查了过去15年中至少经历过一次合同过渡的实验室和生产现场的结果变量;当查看所有DOE办事处(包括国家核安全局(NNSA),科学(OS)和环境管理(EM)办公室,可记录的总病案率(衡量安全绩效),不符合项跟踪系统(衡量对法规要求的遵守程度)以及综合预算在统计上都很重要,显着性水平为5%。 R&D 100奖励(一种研究和开发措施)和违规通知(一种遵守法规要求的措施)在统计上具有显着意义,显着性水平为10%。能源部任何办公室的合同过渡后,其他结果变量(专利,授标费,损耗和发生报告)均未进行统计更改。

著录项

  • 作者

    Conner, Harold T., Jr.;

  • 作者单位

    The University of Alabama in Huntsville.;

  • 授予单位 The University of Alabama in Huntsville.;
  • 学科 Engineering Industrial.
  • 学位 Ph.D.
  • 年度 2013
  • 页码 213 p.
  • 总页数 213
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TS97-4;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号