The Brunei Building, part of the redevelopment of the Paddington basin, was commissioned by Derwent London with the aspiration of achieving high-quality, innovative and industry-leading design and engineering.Laing O'Rourke was engaged as main contractor for the project from the start of demolition in January 2016 through to practical completion in April 2019. The first exposed, architectural concrete commenced in January 2017, with the start of the basement core and soffits. The cores were constructed using a hydraulically lifted PERI jumpform system. This allowed the cores to be constructed ahead of the steel diagrid and lattice plank floor structures. The north and south cores were complete as the diagrid and floors commenced. The central core and floor plates overlapped for a time, so close co-ordination between the trades was required to ensure that the resources and space were available on-site when needed.
机译:文莱大楼是帕丁顿盆地重建的一部分,由德伦敦委托,愿望实现高质量,创新和行业领先的设计和工程。Laing O'Rourke从2016年1月开始拆迁开始于2016年1月的拆迁开始的主要承包商。首次暴露的建筑混凝土于2017年1月开始,随着地下室核心和拱门开始。使用液压提升的PERI跳线系统构建核心。这使得芯可以在钢的金刚石和晶格木板地板结构之前构建。北部和南核是完整的,因为一流和地板开始。中央核心和楼板持续时间重叠,因此需要在交易之间密切协调,以确保在需要时提供资源和空间。

著录项

  • 来源
    《Concrete》 |2019年第10期|54-56|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号