...
首页> 外文期刊>Concrete >Biaxial Flat Slab Floor Construction
【24h】

Biaxial Flat Slab Floor Construction

机译:双轴平板楼板施工

获取原文
获取原文并翻译 | 示例
           

摘要

Use of concrete flat slab construction has increased in the UK in recent years, but construction has been primarily an in-situ operation requiring extensive formwork, skilled labour and specialist equipment. Its use has also been limited by the fact that the flat slab becomes less efficient with spans greater than 6m.rnWhen Pinnacle Consulting Engineers, on behalf of Tesco Stores, wanted to create a 16m × 12m grid for an underground car park at its new development in Orpington, post-tensioned concrete would traditionally have been the method of choice - but not any more.rnThe Tesco development is a joint venture with contractor Stephenson Shell & Core and the building work is being carried out by BAM Construction. The architect is Michael Aukett Architects.
机译:近年来,在英国使用混凝土平板建造的建筑有所增加,但建筑主要是现场作业,需要大量的模板,熟练的劳动力和专业的设备。扁坯的效率降低,跨度超过6m时,效率也受到限制。rn当Pinnacle Consulting Engineers代表Tesco Stores想要为其新开发的地下停车场创建一个16m×12m的网格时在Orpington,传统上是选择后张拉混凝土的方法-但现在不再选择。Tesco开发项目是与承包商Stephenson Shell&Core的合资企业,建筑工作由BAM Construction进行。建筑师是Michael Aukett Architects。

著录项

  • 来源
    《Concrete》 |2009年第1期|34-35|共2页
  • 作者

    Roger Northam;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号