...
首页> 外文期刊>Concrete >Highbury Square -rnthe Construction Challenge
【24h】

Highbury Square -rnthe Construction Challenge

机译:海布里广场-建设挑战

获取原文
获取原文并翻译 | 示例
           

摘要

The Stadium, Highbury Square development is the final piece in the Arsenal FC Highbury redevelopment masterplan for construction of the new Emirates Stadium, which included building a new waste transfer station so that the existing site could be used for the new stadium.rnConstruction of key worker accommodation, a new museum and offices on the new stadium site were other key factors to allow the existing Highbury Stadium to be redeveloped into a new leisure, retail and residential area - an important element in the regeneration of the local community. Byrne Bros (BBF) was appointed by Sir Robert McAlpine (SRM) as the concrete package contractor on all of these components of the masterplan and the success of the overall development is due, in no small measure, to excellent working relations between SRM, BBF and Buro Happold - the civil/structural engineer.
机译:海布里广场体育场的发展是阿森纳足球俱乐部海布里重建计划总体规划中的最后一部分,该总体规划用于建造新的阿联酋体育场,其中包括建造新的废物转运站,以便现有场地可用于新体育场。住宿,新博物馆和新体育场场地上的办公室是其他关键因素,可将现有的海布里体育场重新开发为新的休闲,零售和住宅区-这是当地社区复兴的重要因素。 Robert McAlpine爵士(SRM)任命Byrne Bros(BBF)为总体规划所有这些组成部分的具体包装承包商,整体开发的成功在很大程度上要归功于SRM,BBF之间的良好工作关系和Buro Happold-土木/结构工程师。

著录项

  • 来源
    《Concrete》 |2008年第7期|14|共1页
  • 作者

    Peter Blaseby;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号