首页> 外文期刊>Concrete >Concrete keeps the Legoland rollercoaster rolling
【24h】

Concrete keeps the Legoland rollercoaster rolling

机译:混凝土使乐高乐园过山车保持滚动

获取原文
获取原文并翻译 | 示例
           

摘要

Mott MacDonald was commissioned by Legoland Windsor Park Ltd in September 2003 to undertake detailed design of the foundation substructure and superstructure for a new rollercoaster in its theme park, located in the heart of Berkshire. The construction programme was extremely tight and the project was scheduled for completion by the end of March 2004 in readiness for the new 2004 season. The successful delivery of the project was only achieved through a flexible and adaptable design process relying on close consultation and cooperation between the client, Mott MacDonald (the designers), MACK (the ride manufacturer) and Brymor Contractors Ltd (the principal contractor).
机译:莫特·麦克唐纳(Mott MacDonald)受乐高乐园(Legoland)温莎公园有限公司(Legoland Windsor Park Ltd)委托,于2003年9月为位于伯克郡中心地带的主题公园中的新型过山车进行基础下部结构和上部结构的详细设计。施工计划非常紧张,该项目计划在2004年3月底前完成,为2004年新季节做好准备。只有通过客户,设计师Mott MacDonald(设计师),MACK(乘车制造商)和Brymor Contractors Ltd(主要承包商)之间的密切协商与合作,才能通过灵活,适应性强的设计过程来成功完成项目。

著录项

  • 来源
    《Concrete》 |2004年第6期|p.35|共1页
  • 作者

    STEPHEN DULSON;

  • 作者单位

    MOTT MACDONALD;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号