...
首页> 外文期刊>Concrete >Strengthening Kingston Bridge, Glasgow
【24h】

Strengthening Kingston Bridge, Glasgow

机译:加强格拉斯哥金斯顿桥

获取原文
获取原文并翻译 | 示例
           

摘要

Opened on 26 June 1970, Kingston Bridge, Glasgow,rnwas built from in-situ pre-stressed concrete using balanced cantilever construction. With a main span of 143m and two 62.5m side spans, it remains among the largest examples of this type of construction. Designed to carry five lanes of traffic in either direction, it now carries more than 180,000 vehicles per day and forms a strategically important crossing of the River Clyde. There is no suitable alternative for most of the traffic using this route and any disruption would have a severe economic and environmental regional impact.
机译:格拉斯哥金斯敦大桥于1970年6月26日开放,采用平衡的悬臂结构,用现成的预应力混凝土建造而成。它的主跨度为143m,两个侧跨为62.5m,仍然是此类建筑的最大实例。它设计成可在任一方向上通行五车道,如今每天可运载超过18万辆车辆,并形成了克莱德河的重要战略通道。对于使用此路线的大多数交通来说,没有合适的替代方法,任何中断都会对经济和环境区域造成严重影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号