...
首页> 外文期刊>IEEE Computer Applications in Power >Computing the cost of unbundled services [power transmission]
【24h】

Computing the cost of unbundled services [power transmission]

机译:计算非捆绑服务的成本[电力传输]

获取原文
获取原文并翻译 | 示例
           

摘要

A central tenet of electric power industry deregulation is that the delivery of electric power (a service) must be decoupled from the purchase of the power itself (a product) and priced and contracted separately. Transmission of electricity must be offered and priced separately from the power itself, and delivery of power must stand on its own as a business. Regardless of the precise nature of the deregulated system's rules and structure, this means that transmission system operators need to know the actual operating costs of providing transmission services to their customers. Here, the authors argue that such analysis of costs and cost flow will become as routine and sophisticated as the analysis of electrical performance is at the present.
机译:电力行业放松管制的中心原则是,电力(服务)的交付必须与电力本身(产品)的购买脱钩,并分别定价和订立合同。电力传输必须与电力本身分开提供和定价,并且电力交付必须独立进行。无论放松管制的系统规则和结构的确切性质如何,这都意味着传输系统运营商需要了解向其客户提供传输服务的实际运营成本。在这里,作者认为,这种对成本和成本流的分析将变得与目前对电性能的分析一样常规和复杂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号