Design and construction of earth retaining walls for deep excavation - a risk management process

机译:深基坑土方挡土墙的设计和施工-风险管理过程

获取原文
获取原文并翻译 | 示例
           

摘要

TR26: 2010: Technical Reference for Deep Excavation requires a detailed assessment of buildings in proximity to the site. The requirement is an important part of a risk management process for the design of temporary works for deep excavations. This paper will present the key elements of the risk management process for design and construction. It will demonstrate that the risk management process for temporary works design for deep excavation is not merely to control the predicted wall deflection to a limit of 0.5%H, where H is the depth of excavation, which is an arbitrary value for a given site. The risk management process requires to go through the stages of hazard identification, risk assessment, risk control and risk monitoring. By following the risk management process the design and construction of deep excavations can achieve the objectives of safety and cost efficiency.
机译:TR26:2010:《深度挖掘技术参考》要求对场地附近的建筑物进行详细评估。对于深基坑临时工程的设计,该要求是风险管理过程的重要组成部分。本文将介绍设计和施工风险管理过程的关键要素。它将证明,深基坑临时工程设计的风险管理过程不仅仅是将预测的墙体挠度控制在0.5%H的范围内,其中H是基坑的深度,它是给定位置的任意值。风险管理过程需要经历危害识别,风险评估,风险控制和风险监控等阶段。通过遵循风险管理过程,深基坑的设计和施工可以达到安全和成本效益的目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号