...
首页> 外文期刊>Hydrotechnical construction >Experience in restoration of the spillway dissipator of the head hydroelectric station of the Chir-Yurt sequence
【24h】

Experience in restoration of the spillway dissipator of the head hydroelectric station of the Chir-Yurt sequence

机译:

获取原文
           

摘要

1.Operators should not violate the rules of operating gates established in designs on the basis of hydraulic investigations.2.An increase of the resistance of uplift and withdrawal of the apron slabs of the bottom of a dissipator should be achieved primarily by anchoring them to the foundation, which also saves construction materials.3.Protection of the surface of slabs and blocks of a dissipator from abrasion is achieved by placing on the slab surface a wear-resistant layer of high-grade, heavily reinforced, well-compacted and cured concrete prepared with strong crushed rock.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号