.Method for connecting continuously slab concretes of multi-span preflex composite bridge and represtressed preflex composite bridge.

机译:。多跨度预弯复合桥与预应力预弯复合桥连续板混凝土的连接方法。

摘要

Steel I-girder with reinforced concrete or the same time blood seed strand or blood. Mr. Beam simple combination of steel rods joined Preflex beam or leaf Wrist rests free of two or more span a flex-beam is a hypothesis independently on each of the span bridge alternately in as after, placing an upper slab of concrete so that each span is continuous, in the prior art, each successive coupling points according to the change of successive beam structural system such that each span a continuous during construction a simple beam structural system after the switching to the continuous beam structural system with respect to the negative moment load acts because the upper concrete slab, the tensile stress is generated. In general, the upper concrete slab of continuous binding points this case is a crack in the concrete severely generated as a structure can not sufficiently resist the tensile stress is gradually weakened structural damage.; In the present invention, as shown in Figures 3 to 6 illustrate the drawing, a top slab concrete 3 before (continuous beam switching to the structural system old) steel I-beam in each pair simply bobim adjacent the continuous attachment point for placing the depending on the support fixing section P, Mr. strand or blood. the seed bar (9) after a pre-disposed to control the initial stress, the top slab of concrete (3) each span in the upper flange 8 of the girder (1) all the tensile stress caused by the negative moment of hameuroseo casting to continuous, continuous connection point P, Mr. strand or blood seed bar (9) Accordingly, the excessive tensile stress and the upper slab of concrete (3) of continuous connection point to be a burden and so as not at all due to cracks or to provide an acceptable range of the crack-free flax span composite girder bridges and leaf Wrist rests Preflex composite slab concrete girder bridge a series of coupling can be suppressed within the method.
机译:带有钢筋混凝土的钢工字钢,或同时带有血种子线或血液。梁先生简单地将钢杆连接到Preflex梁或叶片上,腕部没有两个或两个以上跨度,而在每个跨度桥上分别独立地设置一个挠性梁的假设,如下所述,在上部跨度放置一块混凝土,这样每个跨度在现有技术中,每个连续的耦合点都是连续的,这取决于连续梁结构系统的变化,从而使得在相对于负力矩荷载切换到连续梁结构系统之后,每个连续耦合点在一个简单的梁结构系统的建造过程中跨越一个连续由于上部混凝土板的作用,产生了拉应力。一般而言,上混凝土板的连续粘结点这种情况是在混凝土中严重产生的裂纹,因为结构不能充分抵抗拉伸应力而逐渐减弱结构破坏。在本发明中,如图3至图6所示为附图,在每对中的顶部工字形混凝土3(连续梁切换到旧的结构体系)中的钢工字钢中简单地绕着连续附接点摆动以放置悬垂物。在支架固定部分P上,绞线或血迹。在预先设置以控制初始应力的种子棒(9)之后,混凝土的顶部平板(3)每个跨在大梁(1)的上凸缘8中,所有的变形都是由Hameuroseo的负弯矩引起的到连续的,连续的连接点P,钢绞线或血苗条(9),因此,过度的拉应力和连续连接点的混凝土(3)成为负担,并且完全不会由于裂缝引起或提供可接受范围的无裂纹的亚麻跨度复合梁桥和叶片腕托Preflex复合板混凝土梁桥在该方法中可以抑制一系列耦合。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号