Murray and Roberts in major safety achievement

机译:Murray和Roberts在重大安全成就上

获取原文
获取原文并翻译 | 示例
           

摘要

Murray & Roberts has achieved a significant safety milestone of 500 000 hours lost time injury free on the Anglo Platinum Slag Cleaning Furnace project at the Waterval Smelter. The project is being implemented as an EPCM contract in a joint venture with Murray & Roberts and Pyromet Technologies. "The safety milestone is a significant achievement for the project which is approximately 70 percent complete," says Murray & Roberts project manager, Alan Wingrove. "Safety is a priority for Murray & Roberts and the slag cleaning furnace achievement within a 'brown-field' environment demonstrates the high standards and construction management disciplines that are adhered to on any given project. We are proud of having reached the milestone and intend to complete the project injury free early in 2003."
机译:Murray&Roberts在Waterval冶炼厂的盎格鲁白金炉渣清洗炉项目上实现了50万小时无工伤的重要安全里程碑。该项目正在与Murray&Roberts和Pyromet Technologies合资成立,作为EPCM合同执行。 Murray&Roberts项目经理艾伦·温格罗夫(Alan Wingrove)说:“安全里程碑是该项目的一项重大成就,已完成约70%。” “安全是Murray&Roberts的重中之重,在“棕地”环境中实现炉渣清洗炉的成功表明了在任何给定项目中都遵循的高标准和施工管理纪律。我们为实现这一里程碑和目标感到自豪在2003年初完成该项目的无伤害工作。”

著录项

  • 来源
    《Mining Mirror》 |2003年第8期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号